|
|
 |
|  |
|
Reported: 5/17/2010 12:52:00 PM |
Updated: 6/29/2010 10:41:00 AM
|
|
Title: |
General Construction IDIQ For GSA/NCR
|
|
|
City/County: |
Washington, DC (District of Columbia County)
|
|
|
Category(s): |
Economic Stimulus, Government/Public
|
|
|
Sub-Category(s): |
Military Facility, Recovery Project
|
|
|
Contracting Method: |
Competitive Bids.
|
|
|
Project Status: |
Request for Proposals (RFP).
|
|
|
|
|
Estimated Value: |
$10,000,000
|
|
|
|
|
Plans Available from: |
Federal Agency
|
|
|
Performance Bond: |
Required
|
|
|
|
|
|
|
Description: |
The purpose of this IDIQ contract is to establish terms and conditions upon which the Contractor(s) will conduct General Construction repairs and alterations to Government owned and leased space in various buildings within the geographic boundaries established in this contract, under delivery orders issued by the Contracting Officer and Designated Ordering Officials. In addition, some orders may include the requirement to provide design capability in the form of, but not limited to, drawings or sketches to describe proposed repair and alteration projects and to provide descriptions or specifications for proposed materials or equipment. The contractor(s), in these instances, will be responsible for obtaining assistance from registered professional architects or engineers or other professionals as needed or as required in the Scope of Work for a proposed order. In the event that architect-engineer services are required, the contractor may be required to secure the services of an architect-engineer contractor to provide the following but not limited to: architectural, structural, civil, fire safety, estimating, mechanical, and electrical engineering services associated with design concepts, working drawings and specifications, shop drawings, material and related documents review.
The proposed contract type is Multiple Award, Indefinite Delivery/Indefinite Quantity (IDIQ). Work will be ordered via firm-fixed price Task Orders. The Government intends to make multiple awards to HubZone businesses only. The period of performance for this award is one year, with the Government having the unilateral option to renew for four additional one year periods. The maximum annual contract amount will be $10,000,000. The contract's guaranteed minimum amount is $1,000, base year.
|
|
|
Details: |
| Division 02 - | Site Work, Subsurface Exploration, Clearing, Earthwork, Site Grading, Excavating & Backfilling, Trenching, Roadway Excavation, Backfill & Compaction, Site Drainage, Site Utilities, Paving & Surfacing, Walks, Landscaping, Piped Utilities, Fencing. | | Division 03 - | Concrete, Cast-in-place Concrete, Precast Concrete. | | Division 04 - | Masonry, Unit Masonry. | | Division 05 - | Metals, Structural Metal Framing. | | Division 06 - | Carpentry, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Cabinets. | | Division 07 - | Thermal and Moisture Protection, Waterproofing, Dampproofing, Insulation, Roofing. | | Division 08 - | Doors, Windows and Glass, Metal Doors & Frames, Wood & Plastic Doors, Special Doors, Entrances & Storefronts, Hardware & Specialties, Glazing. | | Division 09 - | Finishes, Gypsum Wallboard, Tile, Acoustical Treatments, Resilient Flooring, Carpeting, Special Flooring, Special Coatings, Painting, Acoustical Ceilings. | | Division 10 - | Specialties, Chalkboards & Tackboards, Compartments & Cubicles, Flagpoles, Signs and Identifying Devices, Pedestrian Control Devices, Lockers, Special Shelving, Toilet Partitions & Accessories, Signage. | | Division 11 - | Equipment, Parking Control, Loading Dock. | | Division 12 - | Furnishings, Manufactured Casework, Furniture, Multiple Seating, Systems Furniture. | | Division 13 - | Special Construction, Special Purpose Rooms, Security Access and Surveillance, Detection and Alarm. | | Division 15 - | Mechanical, Air Distribution, Refrigeration, Controls and Instrumentation, Insulation, HVAC, Fire Protection, Plumbing, Fire Sprinklers. | | Division 16 - | Electrical, Lighting, Special Systems, Communications, Alarm & Detection, Fire Alarm & Detection, Smoke Detector, Heating & Cooling, Controls & Instrumentation. |
|
|
|
|
|
Information is provided under terms and conditions of Construction Journal, Ltd's website Terms of Use. The information contained herein is proprietary and confidential, and may contain trade secrets. While reasonable care has been taken in the preparation and presentation of the information, accuracy is not guaranteed. Reproduction, distribution or creation of derivative works is not allowed.
|
|
|
|