Active Projects
Roadway and Small-Scale Drainage Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Sweetwater, FL 33172
Drainage Repairs and Improvements
Infrastructure
Post-Bid
$150,000 CJ est. value
Miramar, FL 33025
South Bayshore Lane/Fairview Pump Station Project
Infrastructure
Post-Bid
$4,869,313 CJ est. value
Miami, FL 33133
Hollywood Beach Utility Improvements
Hoover Pumping System Evaluation
RFQ D/B - Design-Build Services for a 54-Inch Diameter Water Transmission Main
Design-Build Services for New Cruise Terminal H Program
Dade Water and Sewer Department (WASD) South and Central District Wastewater Treatment Plants Sludge Thickening and Dewatering Buildings
Historic Miramar Infrastructure Improvements, Phase IV
HVAC Improvements South District Wastewater Treatment Plant
ADA Engineering, Inc.
Company Type: Architect
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Albert Argudin | (305) | @.net | ||||||||
Alberto Argudih | (305) | @.net | ||||||||
Ivette O Argudin | (305) | @.net | ||||||||
Jorge M. Plasencia | (305) | @.net | ||||||||
Julio Cuenca | (305) | @.net | ||||||||
Maria Alvarez | (305) | @.net | ||||||||
Ramirco Herdocia | (305) | @.net | ||||||||
Waddie Ruiz | (305) | @.net |