Active Projects
Intersection Improvements (Concrete Paving) on SR-13 (US-43) at Jackson Road
Infrastructure
Post-Bid
$750,000 CJ est. value
Creola, AL 36525
Interchange Modifications (Traffic Stripe Alterations, Ramp Closure, Ramp Extension, and Traffic Signal Installation)
Infrastructure
Results
$1,065,831 CJ est. value
Brighton, AL 35020
Roadway Improvements/Concrete Pavement Replacement (Grading, Drainage, Base, Concrete Pavement, and Concrete Removal) on SR-7
Infrastructure
Results
$6,220,874 CJ est. value
Cottondale, AL 35453
Intersection Improvements (Grading, Base, Concrete Pavement, and Traffic Stripe) on SR-25 (US-411)
Safety Improvements (Bridge Rail Retrofit) on I-59
Curb and Ramp Installations on SR-4, SR-7, SR-23, SR-25, SR-53, SR-75, and SR-144 at Various Locations
Roadway Improvements (Concrete Paving and Traffic Stripe) on SR-14 at the Quarry Entrance
Intersection Improvements (Concrete Paving) on SR-10 at SR-28
Intersection Improvements (Concrete Paving, Acceleration Lanes, Turn Lanes, and Traffic Stripe) on SR-13 (US-43) at SR-178
Intersection Improvements (Concrete Pavement) on SR-3 (US-31) at SR-25