Active Projects
Green Meadows Drainage Dykes Road SWRA-022
Infrastructure
Bidding
$4,000,000 est. value
Southwest Ranches, FL
Citywide Sidewalk Improvements Phase II
Infrastructure
Post-Bid
$300,000 est. value
Doral, FL
Historic Miramar Infrastructure Improvements, Phase IV
Infrastructure
Post-Bid
$14,500,000 est. value
Miramar, FL
Milling and Resurfacing Project
Concrete Sidewalk Replacement
Milling and Resurfacing of Island Park Asphalt Walk Path
Sewer Force Main Replacement
Hart Avenue Drainage and Water Main Improvements
District Six South Dade Maintenance Yard Parking Lot Resurfacing and Striping Project
Sidewalk/Retaining Wall/Drainage Improvements (BDI)
American Design Engineering Construction, Inc
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Joel Espinal | ![]() | (954) ![]() | ![]() | ![]() ![]() | ||||||
Steven Espinal | ![]() | (954) ![]() | ![]() | ![]() ![]() |