Active Projects
30-Inch Transmission Main Crossing Highway 287 and Along Lone Star Road
Infrastructure
Bidding
$3,400,000 CJ est. value
Bellevue, TX 76228
Transmission Main From Lonestar Road to Southpoint Drive
Infrastructure
Bidding
$3,400,000 CJ est. value
Mansfield, TX 76063
Engineering - Pipeline Design for the Cedar Creek Wetlands
Infrastructure
Post-Bid
$25,000,000 est. value
Palestine, TX
Construction Services - Surface Water Supply Project - Central Pump Station and RePump Station
Easton Park Segment F and G 36-Inch Water Transmission Main
Windmill Farms Walden Pond Water Line Extension
Sunterra Phase 3 Pipeline Removal and Demolition
Interstate Highway 20 and Mallory Trail 12 and 16 Inch Water Lines
American Ductile Iron Pipe
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Tyler Bolen | (913) | @.com |