Active Projects
Design-Build Services for 36 inch Sanitary Sewer Force Main along Northwest 107 Avenue
Infrastructure
Post-Bid
$9,577,412 CJ est. value
Doral, FL 33178
RFQ D/B - Design-Build Services for a 54-Inch Diameter Water Transmission Main
Infrastructure
Post-Bid
$32,398,000 CJ est. value
Miami, FL 33131
Drain Cleaning Contract
Results
$392,000 est. value
FL
Drain Cleaning Contract
Proposed 16-inch, 12-inch, and 8-inch DI Water Main and 10-inch and 8-inch DI Gravity Sewer
Milling and Resurfacing/ Drainage Improvements/Sidewalk/Base Work
Bike Lane/Sidewalk/Milling and Resurfacing/Drainage Improvements
Sandhill Boulevard Phase I
American Pipeline Construction LLC
10117 SW 5th Street
FL, Miami 33174
(786) 236-5019
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Andres Luna | (786) | @.com | ||||||||
Felix Valdez | (786) | @.com | ||||||||
RafaeL Perez | (786) | @.com |