Active Projects
Replacement of Existing Structure With a Single Span Steel Beam Structure With Concrete Deck and HMA Approach Roadways on Geneva Road
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Winfield, IL 60190
Superstructure Removal and Construction of Tub Girder Superstructure With Concrete Slab Dck and Concrete Substructure Repair, and Sidewalks on Wedgwood Drive
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Westchester, IL 60154
Deck Overlay and Joint Repair of Structure Carrying 1-55
Infrastructure
Bidding
$4,000,000 CJ est. value
Channahon, IL 60431
Bridge Rehabilitation
Bridge Preservation Project: Bridge Repair, Joint Replace/ Repair and Deck Overlay on Bridge Carrying Il 60 (Townline Rd)
Bridge Structural Repairs, Bridge Deck Overlay Removal and Replacement, Joint Replacement, and Bridge Drainage Repairs, for the Ohio St.
German Church Road Over Flag Creek
Bridge Rehabilitation Project Includes Deck Scarification, Latex Concrete Overlay, Joint Replacement and Approach Slab Repairs on Roosevelt Road
Bridge Deck Overlay and Joint Repairs of Roosevelt Road and Resurfacing of Roosevelt Road
Bridge Deck Overlay and Joint Repairs of IL 58 (Dempster Street)