Active Projects
Magnolia Springs Wastewater Treatment Plant Phase 1 0.20 MGD
New Construction
Post-Bid
TX
Demolition of Existing Water Plant Facilities
Infrastructure
Post-Bid
Houston, TX 77071
Lake Granbury Power Line Clearance Project
Infrastructure
Post-Bid
Granbury, TX
Construction of Regional Lift Station and Local Lift Station Number 2 for Chapel Run
Clearing and Grubbing for Black Oak Phase 2
Paving, Drainage, and Pedestrian Improvements for Trinity Drive - from Greenbriar Drive to 400 LF North of Bluebonnet Drive
Proposed Paving and Storm Water Facilities to serve Davenport Parkway and Discovery Drive at Alvin ISD
Public 4" Sanitary Force Main and Public 12" Water Line to Serve Shops at Gaston Road
Construction of Water, Sanitary and Drainage Facilities in Royal Brook at Kingwood Section 25
Water, Sanitary and Drainage Forest Village Section 12
Aztlan Utilities
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Daniel Munoz | (832) | @.com | ||||||||
Jimmy Webster | (832) | @.com |