Active Projects
New Oil Dock 22 Marine Terminal
Infrastructure
Post-Bid
$33,691,200 CJ est. value
Corpus Christi, TX 78401
Mass Grading in Paradise Farms
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Spring, TX 77373
Katy-Fort Bend County Road Extension Phase III
Infrastructure
Post-Bid
$3,100,000 est. value
Katy, TX
Old Hearne Road - Phase 1 Reconstruction and Drainage Improvements
Townsend Reserve Phase 1 Detention and Channel
Paving Improvements for the Highlands Section Nine
Bridgeland Central Section 3 Water Distribution System, Non-Potable Water Distribution System, Sanitary Collection System, Storm Drainage System, and Street Paving
Bridgeland Mason Road Street Dedication Section 8 Water Distribution System, Non-Potable Water Distribution System, Sanitary Collection System, Storm Drainage System, and Street Paving
Bridgeland Central Section 2 Water Distribution System, Sanitary Collection System, Storm Drainage System, and Street Paving
Water - Sanitary Sewer - Drainage and Detention to Serve Newport Sections 6 and 10
Burnside Services Inc/BSI
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Ashlyn Reininger | (936) | @.com | ||||||||
Burnside Estimating | (936) | @.com | ||||||||
Christopher Brooks | (936) | @.com | ||||||||
David B Norris Jr | (936) | @.com | ||||||||
Jake Burnside | (936) | @.com | ||||||||
laura Caldwell | (936) | @.com | ||||||||
Tina McKenzie | (936) | @.com |