Active Projects
Granger Pines Water System Water Plant 2
Infrastructure
Bidding
$700,000 CJ est. value
Dobbin, TX 77333
Hastings Green Wastewater Treatment Plant Lift Station Rehabilitation
Infrastructure, Renovation
Post-Bid
$1,865,000 CJ est. value
Houston, TX 77065
Audubon Water Plant No 1 Phase I
Infrastructure
Post-Bid
$1,150,000 CJ est. value
Magnolia, TX 77362
CDBG-MIT Lift Station Improvements
Motor Control Center Replacement at Water Plant No.1
Medium Voltage Electrical Cable Installation at Bayport Container Terminal
Medium Voltage Electrical Cable Installation at Bayport Container Terminal
Construct Ductbank Including Bore to Support East End at Bayport Container Terminal
Construct 12 Acre Expansion of an Interim Container Storage Facility for the Redevelopment of the West End of Barbours Cut Terminal
South Diamondhead at Gum Gully Utility Relocation
Burrer Engineering.
17217 North Eldridge Parkway
TX, Tomball 77377
(832) 761-5220
Company Type: Engineer
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
C. Saad Mahmoud | (832) | @.com | ||||||||
Eric Burrer | (832) | @.com | ||||||||
John Osborn | (832) | @.com | ||||||||
Ricardo Guzman | (832) | @.com |