Active Projects
Detention Outfall for the Trails Phase I
Infrastructure
Results
$300,000 est. value
Conroe, TX
Construction of Excavation and Mass Grading for the Trails Phase I
Infrastructure
Results
TX
Construction of Paving Facilities in the Trails Section 3 and the Trails Section 4
Infrastructure
Results
TX
Construction of Water, Sanitary, and Drainage Facilities in The Trails Section 3 and The Trails Section 4
Construction of Water, Sanitary, and Drainage Facilities in Cross Pines and the Trails Drive, the Trails Section 1, and the Trails Section 2
Construction of Paving Facilities in Cross Pines and The Trails Drive, The Trails Section 1, and The Trails Section 2
Construction of Water, Sanitary, and Drainage Facilities in the Trails Drive and Cross Pines Drive, the Trails Section 1, and the Trails Section 2