Active Projects
Lake Bonham Raw Water Intake Channel Improvements
Infrastructure
Bidding
$1,000,000 CJ est. value
Bonham, TX 75418
New Oil Dock 22 Marine Terminal
Infrastructure
Post-Bid
$33,691,200 CJ est. value
Corpus Christi, TX 78401
Bulk Dock 1 Expansion of Landside Operations
Infrastructure
Post-Bid
$2,077,000 CJ est. value
Corpus Christi, TX 78401
Commodore Cove - Dredging of Canals
Mississippi River Outlets, Vicinity of Venice, Louisiana, Baptiste Collette Bar Channel #22-1, Maintenance Dredging, Plaquemines Parish, LA
Oil Dock 1 Structural Repairs and Upgrades
Oil Docks 8 and 9 Cathodic Protection and Marine Maintenance Repairs
Houma Navigation Canal - Inland Channel Maintenance Dredging
Spring Lake and William R. Gaines Jr. Veterans Memorial Park Pier Repairs
Englewood Beach and Chadwick Park Pier Repairs
Callan Marine | Atlantis Marine
4800 Port Industrial Road
TX, Galveston 77554
(409) 762-0124
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Gregory Harner | (409) | @.com | ||||||||
Joey Maldonado | (409) | @.com | ||||||||
Jordan Guy | (409) | @.com | ||||||||
Oliver Jones | (409) | @.com | ||||||||
Sarah Dearing | (409) | @.com |