Active Projects
Engineering - Pipeline Design for the Cedar Creek Wetlands
Infrastructure
Post-Bid
$25,000,000 est. value
Palestine, TX
On-Call Engineering Services
Infrastructure
Post-Bid
TX
Engineering and Surveying Services
Alteration
Post-Bid
Bryan, TX
Natural Gas Main and Service Line Replacement
R1 PSI-70 Floyd Hill to Veterans Memorial Tunnels Design Eng Services
Flying Horse Detention Pond 1 Retrofit CM and Geotechnical Engineering Services
Engineering Services
Parker Midsection Pipeline Project, Engineering Services
Design-Build Services for LNG Peak Shaving Facility Expansion
Pioneer North Substation Project
Campos EPC LLC
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Dan Wilkerson | (303) | @.com | ||||||||
Matthew Brown | (303) | @.com | ||||||||
Randy Ray | (303) | @.com |