Active Projects
The Construction of Proposed Phase 2 Irrigation Improvements for the Pump Station No. 3 and Makeup Well No. 2 Along Katy Gaston Road Serving Lakes of Bella Terra
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Katy, TX 77406
Detention Pond Side Slope Failure Repairs for Del Webb The Woodlands
Infrastructure
Post-Bid
$100,000 CJ est. value
The Woodlands, TX 77380
Construction of Water Distribution and Sanitary Sewer Collection To Serve Rothwood Center - 22131 Rothwood Road
Infrastructure
Post-Bid
$200,000 est. value
Spring, TX 77389
12 Inch Emergency Interconnect With Faulkey Gully Mud
Queenston Waterline Loop
Lovett Industrial Sanitary Lift Station and Force Main
Katy Court Offsite Water Line and Forcemain
Tract 7 Lift Station
Church Utility Extensions
Construction of Irrigation Pump Station No. 2 Improvements Along South Lugano Verde Drive Serving Lakes of Bella Terra
Canyon Construction Company
3307 Redwood Grove Street
TX, Pearland 77581
(281) 972-4339
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Carrie McCleery | (281) | @.net | ||||||||
Sam McCleery | (281) | @.net |