Active Projects
Construction Services for the SIPS-Southside Boulevard Intertie to Deerwood III WTP - SIPS Water Main and Raw Water Main - Segment 2
Infrastructure
Bidding
$12,540,000 est. value
Jacksonville, FL
Septic to Sewer Collection System Project
Infrastructure
Post-Bid
$300,000 est. value
Orange Park, FL
SR 392A (Hutchison Blvd) Milling and Resurfacing /Traffic Signals/Sidewalk
Infrastructure
Post-Bid
$7,433,636 est. value
FL
Gradation #2, Braker Rock at the Sherman Town Gravel Pit
Bessie Circle Water Main Installation
Emerald Trail Model Project Construction - PQ Horizontal
Hampton Falls Drive Electrical Easement 12-Inch Watermain Replacement
SR 312 - Milling and Resurfacing/Clearing and Grubbing/Excavation/Embankment/Drainage Improvements
CCCN E-W Patrol Road Construction Services
Hampton Falls Drive Electrical Easement 12-Inch Watermain Replacement
Capps Land Management
Company Type: Contractor
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Amanda Duncan | ![]() | (904) ![]() | ![]() | ![]() ![]() | ||||||
April Capps | ![]() | (904) ![]() | ![]() | ![]() ![]() | ||||||
Clyde Cross | ![]() | (904) ![]() | ![]() | ![]() ![]() | ||||||
Jason Freeman | ![]() | (904) ![]() | ![]() | ![]() ![]() | ||||||
Josh Newman | ![]() | (904) ![]() | ![]() | ![]() ![]() | ||||||
Shawn Atchley | ![]() | (904) ![]() | ![]() | ![]() ![]() | ||||||
Tony Hemmerly | ![]() | (904) ![]() | ![]() | ![]() ![]() |