Active Projects
RFQ Engineering - Inspection, Analysis, and Reporting of a Large Diameter (72-Inch) Water Transmission Main
Term Contract
Bidding
Little Rock, AR 72201
One (1) Hl150m Diesel Dri-prime Pump or Pioneer Pump as an Acceptable Equal
Term Contract
Post-Bid
Little Rock, AR 72201
Lake Maumelle Intake Pump Station Powdered Activated Carbon Improvements Contract A - PAC Building
New Construction, Infrastructure
Post-Bid
$200,000 CJ est. value
Roland, AR 72135
Tank Inspections Wilson and Ozark
Central Arkansas Water Headquarters
Jackson Reservoir and Pump Station No.12 Rehabilitation
RFQ - Engineering Services for Water System Model Calibration
WTP Renewal & Resiliency Project
2" Galvanized Water Main Replacements Little Rock Phase 2 2023
Water Pump and Electric Motor
Central Arkansas Water
Company Type: Owner
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Dave Hindman | (501) | @.com | ||||||||
David London | (501) | @.com | ||||||||
Doug Farler | (501) | @.com | ||||||||
Jim Ferguson | (501) | @.com | ||||||||
Joe O'Hara | (501) | @.com | ||||||||
Joseph O'Hara | (501) | @.com | ||||||||
Liz Tuck-Rowan | (501) | @.com | ||||||||
Mary Dyson | (501) | @.com | ||||||||
Matt Smith | (501) | @.com | ||||||||
Thomas Wray | (501) | @.com |