Active Projects
Phase Vl-C project
Infrastructure
Bidding
$200,000 CJ est. value
Effingham, IL 62401
Replace the Bridge Carrying TR 35A
Demolition, New Construction, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Olney, IL 62450
Broadway St. 8" Concrete Pavement
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Louisville, IL 62858
Bituminous Materials Seal Coat
Sidewalk Construction, Reconstruct Existing Driveways, Combination Curb and Gutter, Pavement Markings, and Pedestrian Traffic Signal Improvements on IL 30
Vandalia Road Drainage Project Including Earthwork, Pipe Culverts, Manholes, Sidewalk, and Ancillary Work
Bituminous Materials Seal Coat, Seal Coat Aggregate - Furnish and Apply
Phase Vl-A and Vl-B Projects Including Pipe Culvert, Riprap, Tree and Brush Clearing, Elevated Walkway, Concrete Sidewalk, and Miscellaneous Items
Storm Sewer and Culvert Relining project
2023 Sanitary Sewer Relining
Charleston Engineering-Surveying
Company Type: Owner
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Brandon Bridges | (618) | @.com | ||||||||
Brandon Bridges | (618) | @.com | ||||||||
Michael Bridges | (618) | @.com | ||||||||
Mike Bridges | (618) | @.com |