Active Projects
Kahkwa Avenue Bridge Replacement
Infrastructure
Post-Bid
Erie, PA 16505
2022 Curb Ramps - I
Infrastructure
Results
$200,000 est. value
Erie, PA
2021 Curb Ramps - III
Infrastructure
Results
$135,000 est. value
Erie, PA
East 10th Street and Holland Street Traffic Signal Improvements
2021 Curb Ramps - II
Proposed Kahkwa Bridge Demolition
2021 Curb Ramps - I
Various Highway/Street Castings 2021
City of Erie Engineering Office
Company Type: Agency
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Bill Heiden | (814) | @.us | ||||||||
Jon Tushak | (814) | @.us | ||||||||
Sid Goldstein | (814) | @.us |