Active Projects
Emergency Restoration Transmission and Distribution Construction and Maintenance Services
Alteration
Post-Bid
Orlando, FL
High Voltage Electrical Services
Term Contract
Post-Bid
Kissimmee, FL
Split Oak Substation Construction Project
Post-Bid
Orlando, FL 32832
Electrical Substation Modifications and Various Construction Services
Hord Substation Third Transformer Addition Project
Electrical Improvements to Lift Station E5
Contractor to Install Equipment (69kV Circuit Breaker) and Provide Material at the ODOM Substation