Active Projects
Remove Existing Structure and Construction of a 3-span Precast Prestressed Concrete Deck Beam Bridge on Spill-thru Abutments and Pile Bent Piers on TR 71
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
La Harpe, IL 61450
Construction of a New Single Span PPC Deck Beam Bridge
Infrastructure
Post-Bid
$700,000 CJ est. value
Atlas Township, IL 62370
Phase 3 Water Supply Improvement Project
New Construction
Post-Bid
$300,000 est. value
Quincy, IL
Culvert Removal and Installation
Bridge Beam Repairs on SN 001-0045 Carrying TR 423 (St. Anthony Road) Over I-172, 2.1 Miles South of IL 104
Bridge Rail Repairs on SN 034-0062 Carrying US 136
Replace the Bridge Carrying CH 4
Replace the Bridge Carrying Washington Street
Hydroscarification with Microsilica Overlay on the Bridge Deck and Approaches on SN 009-0013
Remove the Existing Structure and Construct a Three Span Structure to Carry CH 9 Over Mud Creek, One Mile West of Arenzville
County Contractors
1228 East 1350th Street
P.O. Box 3522
IL, Quincy 62305
(217) 885-3550
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Chris Kaufmann | (217) | @.com |