Active Projects
Fabricate/Design Nitrogen Chiller
Term Contract
Post-Bid
Aiken, SC
Legacy (Pcb-Contaminated) Electrolytic Dissolver Transformer Disposition
Post-Bid
Aiken, SC
Fabricate/Design Chiller
Post-Bid
Aiken, SC
Cooling Tower Replacement for TFF Site Preparation Project
DOE/Savannah River Nuclear Solutions LLC
Company Type: Owner
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Barbara McCarty | (803) | @.gov |