Active Projects
Removal & Rebuild the Front Porch, ADA Ramp, Guard Rails and Repair the Back Por
Build-out, Infrastructure
Post-Bid
$800,000 CJ est. value
Detroit, MI 48238
Removal and Replacement of the Roof at the Chandler Park Branch Library
Renovation
Post-Bid
$200,000 CJ est. value
Detroit, MI 48213
Asphalt removal and Subgrade to 12 depth at the Chandler Park Branch Library
Infrastructure
Post-Bid
$500,000 CJ est. value
Detroit, MI 48213
Basement Slab Remediation at Conely Branch Library
Plaster Repairs at Conely Branch Library
Parking Lot Resurfacing & Striping
Category 2 Network Hardware
HVAC Maintenance and Repairs
Lawn Maintenance Services for Detroit Public Library
Mini-Split Ductless HVAC and Hot Water Boiler System Installation at Wilder
Detroit Public Library - Purchasing Department
Company Type: Owner
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Leiann Day | (313) | @.org | ||||||||
Maria Norfolk | (313) | @.org |