Active Projects
Avenue A Reconstruction and 5th Avenue Lift Station Replacement - 3rd Street to 10th Street
Infrastructure
Bidding
$1,484,000 CJ est. value
Rock Falls, IL 61071
Sidewalk reconstruction with ADA accommodations along Shooting Park Road from Sycamore Street to Parkside School entrance in Peru
Infrastructure
Results
$119,776 CJ est. value
Peru, IL 61354
Cedar Point to Standard Water Main Extension
Infrastructure
Results
$1,696,972 CJ est. value
Cedar Point, IL 61316
Dredging of the Spring Valley Barto Landing
Removal and Replacement of Six Concrete Box Culverts on IL 29 (Depue Spur)
Replace the Double Barrel Box Culvert
Wallace Street Reconstruction Phase II
Remove Existing Bridge and Replace With Single-Span Precast Prestressed Deck Beam Bridge on Metal Shell Pile Ben Abutments and Other Collateral Work
Removal and Replacement of Six Concrete Box Culverts on IL 29 (Depue Spur)
Area 5, Phase 2 Sewer Separation & Water Main Reconstruction
Gensini Excavating
10602 Highway 26
IL, Princeton 61356
(815) 659-1660
Company Type: Sub-Contractor
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Joe Gensini | (815) | @.com | ||||||||
Mike Garland | (815) | @.com | ||||||||
Mike Garland | (815) | @.com |