Active Projects
Road Resurfacing
Results
Cullman, AL
Constructing Planing, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe
Results
$1,490,261 to $1,821,430 est. value
Trussville, AL
Constructing Pavement Rehabilitation and Guardrail Safety Improvements (Planing, Resurfacing, Guardrail Installation, and Traffic Stripe)
Results
$4,273,048 to $5,222,615 est. value
Fultondale, AL 35068
For Constructing the Safety Widening, Planing, Resurfacing
Constructing the Micro-Milling, Resurfacing, and Traffic Stripe
Constructing the Concrete Rehabilitation (Shoulder Reconstruction, Bridge Rail Retrofit, and Ramp Improvements) and Steel Blockout Replacement
Constructing the Planing, Resurfacing, Guardrail Installation, Curb Ramp Installation, Traffic Signals, and Traffic Stripe
Cullman High School Parking Lot Overlay - Summer 2020
Constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe
Constructing the Widening, Resurfacing, Culvert Extensions, Guardrail Installations, and Traffic Stripe
Good Hope Paving Contractors
SIC Code: 152103
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Malcolm Douglas | (256) | @.com |