Active Projects
PD and E Study US 98
Infrastructure
Results
$2,800,000 est. value
FL
State SIB Loan for SR 31 (Babcock Ranch) from SR 78 (Bayshore Rd)
Infrastructure
Results
$4,000,000 est. value
D/W Bridge Repair Design
Results
Less than $1,500,000 est. value
Tallahassee, FL
H W Lochner
5850 T.G. Lee Boulevard, Suite 320
FL, Orlando 32822
(407) 482-6600
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Stephen Lewis | (407) | @.com |