Active Projects
Roadway and Bridge Reconstruction Between Milepost 12.02 and Milepost 14.01 in Beaver County
Infrastructure
Bidding
$999,999,999 CJ est. value
Chippewa Township, PA 15010
Design - SR 312 Extension Project From SR207 To SR16
Infrastructure
Results
$8,000,000 est. value
FL
SR 972 - Coral Way - SW 3 Ave from West of SW 12 Ave to Brickell
Infrastructure
Results
$450,000 est. value
FL
SR 5/Us 1/Biscayne BLV from NE 61 ST to NE 6 Ave
Districtwide Traffic Operations Safety Studies Consultant
PA 21 over PA 166
H.W. Lochner Inc
750 Holiday Drive
Sute 590, 9 Foster Square,
PA, Pittsburgh 15220
(412) 250-4280
Company Type: Sub-Contractor
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Kelly Rigot | (412) | @.com |