Active Projects
Wells Brach Parkway Extension 3 (Killingsworth Lane to Cameron Road)
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Pflugerville, TX 78660
Volume I: Mckalla Station Drainage, Road Crossing and Utility Crossing Plan
Infrastructure
Post-Bid
$25,000,000 CJ est. value
Austin, TX 78758
Statewide Professional Design Services
Term Contract
Post-Bid
Austin, TX 78744
Tri-Campus Connectivity Sidewalk Project
Mckalla Station Advance Culvert Construction
2022 Small Diameter Waster and Wastewater Pipeline Eng. RL
KCS Trail and SoPac Trail Project
McKinney Avenue/Cole Two-Way Conversion
2022 Large Diameter Waster and Wastewater Pipeline Eng. Services RL
Fabrication, Delivery, and Installation of Metrorapid Shelters
Huitt-Zollars Inc
Company Type: Owner
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Jonathan Gan | (214) | @.com | ||||||||
Ken Hughes | (214) | @.com | ||||||||
Ken Roberts | (214) | @.com | ||||||||
Rey Gonzalez | (214) | @.com | ||||||||
Rodney Brandon | (214) | @.com | ||||||||
Stephanie Stanford | (214) | @.com | ||||||||
Steven simmons | (214) | @.com |