Active Projects
Concrete Pavement Joint Seal - US-62
Infrastructure
Results
$710,950 CJ est. value
Tahlequah, OK 74464
Repair Pavement, Reseal Concrete, and Remark Runway 18-36, Parallel Taxiway, and Connecting Taxiways
Infrastructure
Results
$534,230 CJ est. value
Wellington, KS 67152
Bridge Water Proof Seal - Multiple Locations in Division IV
Infrastructure
Results
$2,000,000 est. value
Liberal Mid-America Regional Airport - Apron Rehabilitation
Lake Texoma - Environmental Mitigation
Sound Barrier Wall Repair
Steel Guard Railing Along Holiday Creek
Rehabilitate Asphalt Runway 13-31 and Concrete Apron
JLT Contracting, LLC
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
John Lechtenberg | (918) | @.net | ||||||||
John Lechtenberg | (918) | @.net | ||||||||
Tammy Wasson | (918) | @.net | ||||||||
Tammy Wasson | (918) | @.net |