Active Projects
Oak Creek Pedestrian Bridge Replacement Project
Demolition, Infrastructure
Post-Bid
$400,000 CJ est. value
South Lyon, MI 48178
Water System Improvement Phase VI
Infrastructure
Results
$1,608,531 CJ est. value
Oscoda, MI 48750
Hot Mix Asphalt Shared-Use Path and Pavement Markings on French Fry Lane
Infrastructure
Results
$221,845 CJ est. value
Lake Odessa, MI 48849
Gravel Reconstruction Including Roadway Realignment, Shoulder Widening, Drainage Improvements, Guardrail Installation and Pavement Markings on 14 Mile Road
Bridge Rehabilitation on 3 Structures including Epoxy Overlay, Concrete Barrier Replacement, Substructure Repair, Deck Patching, Slab Fascia Repair, Guardrail and Approach Work on M-55 over Augres River
Water System Improvements Phase V
Lower Shore Drive Over Five Mile Creek Box Culvert Installation
Bridge Reconstruction Including Timber Nail-laminated Deck, Cofferdam, Steel Piling, Drainage and Approach Work on 220th Avenue
Pier Concrete Patching Repair on Notter Road and Haist Road
Timber Deck Replacement, Replacement of Wingwalls, Removal of Bridge Hot Mix Asphalt Wearing Surface, Replace With Timber Wearing Surface on Creighton Truck Trail(County Road 448)
John Henry Excavating
1140 Henry Road
MI, East Tawas 48730
(989) 362-3333
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Alexis Henry | (989) | @.net | ||||||||
Alyssa Henry | (989) | @.net | ||||||||
Connie Henry | (989) | @.net | ||||||||
John Henry Jr | (989) | @.net |