Active Projects
Sidewalk Improvements for Bridgewater, Phase 1A
Infrastructure
Post-Bid
Midlothian, TX
Paving Facilities to Serve Prairie Ridge Phase 4
Infrastructure
Post-Bid
TX
Complete Streets Phase 1 - Cedar Hill Downtown
Infrastructure
Post-Bid
Cedar Hill, TX 75104
FM 1382 Sidepath MCIP 40227 Contract
South Clark Road Pedestrian Trail
2021 Sidewalk Improvements Project
Lewisville Valley Ridge Trail
Road to Six Flags Street and 2022 ADA Sidewalk Improvements
Annual Contract for Sidewalk, Handicapped Ramps, Drive Approaches and Curb and Gutter Replacement
Residential Concrete Pavement Repair Zone C6
Ken-Do Contracting
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Amber Crow | (972) | @.com | ||||||||
Dwayne Pruitt | (972) | @.com | ||||||||
Kenneth Halverson | (972) | @.com | ||||||||
Mallory Hoffman | (972) | @.com | ||||||||
Margarita Cazares | (972) | @.com | ||||||||
Mars Freudenberg | (972) | @.com |