Active Projects
Texas Central Railway High-Speed Line
New Construction, Infrastructure
Design
$18,000,000,000 CJ est. value
Dallas, TX 75201
International Parkway Bridges and High Mast Light Poles Replacement Phase 2 Projects
Infrastructure
Bidding
$180,000,000 CJ est. value
Dallas, TX 75201
SH 152 - Surfacing/Roadway Restoration
Infrastructure
Post-Bid
$7,439,116 CJ est. value
Borger, TX 79007
SH 115 - Roadway Rehabilitation
North Harris County Regional Water Authority (HCRWA) - SH 249 Regional Pump Station (Package 2)
Central Everglades Planning Project (CEPP) South Contract 1 L-67a Structures (S-631, S-632, and S-633), Spoil Pile Removal and L-67C Gap Project, Miami-Dade County
RFP Engineering - SE Connector Design-Build Project Design and Professional Services
Veterans International Bridge POV Expansion
Chambers Creek Watershed Floodwater Retarding Structure Site 15 Upgrade and Repair
Lewisville Dam Safety Modification (LDSM) Spillway
Kiewit Infrastructure South
Company Type: Sub-Contractor
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Botlhe Masedi | (402) | @.edu | ||||||||
Brett Newmark | (402) | @.edu | ||||||||
Clint Cole | (402) | @.edu | ||||||||
James Russell | (402) | @.edu | ||||||||
Jeff Dekalb | (402) | @.edu | ||||||||
Jeff Whitehead | (402) | @.edu | ||||||||
Jim Poe | (402) | @.edu | ||||||||
Jim Poe | (402) | @.edu | ||||||||
Jim Poe | (402) | @.edu | ||||||||
Josh Ryan | (402) | @.edu | ||||||||
Joshua Nitz | (402) | @.edu | ||||||||
Keith Meitzler | (402) | @.edu | ||||||||
Kevin McCombie | (402) | @.edu | ||||||||
Lawrence Koneck | (402) | @.edu | ||||||||
Lindsey Owen | (402) | @.edu | ||||||||
Rahul Patil | (402) | @.edu | ||||||||
Ryan Bean | (402) | @.edu | ||||||||
Teresa Lee Ross | (402) | @.edu | ||||||||
Tom Thorn | (402) | @.edu | ||||||||
Travis Bourne | (402) | @.edu |