Active Projects
RHMA (Gap Graded) Overlay With Replace Asphalt Concrete Surfacing
Infrastructure
Bidding
$2,190,000 CJ est. value
Red Bluff, CA 96080
On-System Roadway Rehabilitation 2024
Infrastructure
Bidding
$6,638,859 CJ est. value
Paradise, CA 95969
Place RHMA and HMA, Correct Segments, and Replace AC Surfacing
Infrastructure
Post-Bid
$16,700,000 CJ est. value
Red Bluff, CA 96080
On-System Roadway Rehabilitation Skyway
Saint Anthony Airport Runway 4-22 Reconstruction
Bruce Road Reconstruction
2023 Measure C / SB-1 Pavement Project
Highway 80
Place Hot Mix Asphalt (Type A) and Replace AC Surfacing
Place Hot Mix Asphalt (Type A) and Replace AC Surfacing
Knife River - Chico
Company Type: Sub-Contractor
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Andy Lanier | (530) | @.com | ||||||||
Levi Hubbard | (530) | @.com | ||||||||
Levi Hubbard | (530) | @.com | ||||||||
Marc Madsen | (530) | @.com | ||||||||
Marc Madsen | (530) | @.com | ||||||||
Rick Teegarden | (530) | @.com | ||||||||
Sunny Ingelsion | (530) | @.com |