Active Projects
WWTF Wastewater Treatment Facility Improvements Phase 3A Effluent Force Main Construction
Renovation, Infrastructure
Post-Bid
$70,000 CJ est. value
Custer, SD 57730
WWTF Waste Water Treatment Facility Improvements Phase 3B Transfer Force Main and Lift Station Construction
Renovation, Infrastructure
Post-Bid
$700,000 CJ est. value
Custer, SD 57730
Asphalt Concrete Shared Use Path
Infrastructure
Post-Bid
$902,739 CJ est. value
North Lawrence, SD 57783
E. Anamosa Street - Street and Storm Sewer Repairs
System-Wide Improvements Project
Elkhorn Ridge Addition - Colorado Loop
Elkhorn Ridge Addition - Colorado Loop
Pipe Work, Erosion Control
Harbach Park Phase 1 and Phase 2
Epoxy Chip Seal, Joints, Abutment Repair, Berm Repair, Joints, Reset Bearings, Bridge Rail
Mainline Contracting
4900 South Highway 79
PO Box 3448
SD, Rapid City 57709
(605) 348-7068
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Ben Haggerty | (605) | @.com | ||||||||
Jim Schamber | (605) | @.com | ||||||||
Jim Schamber | (605) | @.com | ||||||||
Reid Hansen | (605) | @.com | ||||||||
Reid Hansen | (605) | @.com | ||||||||
Ty Pivonka | (605) | @.com |