Active Projects
Las Olas Mid-Block Crossings
Infrastructure
Post-Bid
$300,000 CJ est. value
Sunrise, FL 33321
Consultant Structures Inspection Program
Infrastructure
Post-Bid
Tampa, FL
Tampa M.O.V.E.S. Design: Vision Zero, Sidewalks, & Neighborhood Improvements
Term Contract
Post-Bid
Tampa, FL
Intersection Improvements along NW 58th Street at NW 112th and NW 114th Avenue
Architectural and Engineering Consulting Services
Design and Permitting Services for the Hogpen Slough Trail Boardwalk and Shared Use Paths as part of the Village Green Corridor Revitalization Project
Design and Permitting Services for the Hogpen Slough Trail Boardwalk and Shared Use Paths as part of the Village Green Corridor Revitalization Project
Intersection Improvements to Old Cutler Road at SW 152 Street and SW 184 Street
Pet-Friendly Artificial Turf Installation at City Dog Park
SE Indian Street @ SE Willoughby Boulevard Intersection Improvements
Marlin Engineering
3363 West Commercial Boulevard - Suite 115
FL, Fort Lauderdale 33309
(954) 870-5070
www.marlinengineering.com
Company Type: Engineer
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Betsy Jeffers | (954) | @.com | ||||||||
Katherine Salazar | (954) | @.com | ||||||||
Kevin M Beck | (954) | @.com | ||||||||
Rafael Lagos | (954) | @.com |