Active Projects
Drainage Outfall Restoration - Sr 5 (US 1) and SR 50
Infrastructure
Post-Bid
$3,712,340 CJ est. value
Fort Pierce, FL 34950
Remove Built up Soil and Vegetation from the Outfall Ditches
Infrastructure
Results
$800,000 est. value
Desilt Box Culvert
Infrastructure
Contract Awards
$164,500 CJ est. value
Orlando, FL 32804