Active Projects
Replace Switchgear at the Booster Fabrication Facility, Kennedy Space Center, FL
Alteration
Results
$5,000,000 to $10,000,000 est. value
Cape Canaveral, FL
Modify Vehicle Assembly Building High Bay-3 Platforms for Block 1B
Results
$10,000,000 est. value
Orlando, FL 32899
Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4.
Results
$1,000,000 to $5,000,000 est. value
Orlando, FL
Upgrade Vehicle Assembly Building 325 Ton Crane At Kennedy Space Center, Fl