Active Projects
R1 Ps I-25 And Sh-7 Interim Transit Improvements Design Engineering Services
Infrastructure
Post-Bid
$12,000,000 est. value
R1 PS I-70 Resurfacing: Floyd Hill to Chief Hosa, CM, CI and MT Eng. Services
Infrastructure
Post-Bid
Denver, CO 80204
R1 Ps I-70 Resurfacing: Floyd Hill to Chief Hosa, Construction Management, Construction Inspection and Materials Testing Engineering Services
Term Contract
Post-Bid
CO
I-70 Floyd Hill to Veterans Memorial Tunnels
Design Services for St. Vrain Greenway Trail Phase 13
Native Strategies PLLC
12559 South 198th East Avenue
OK, Broken Arrow 74014
(918) 640-6656
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Cole Bayer | (918) | @.com | ||||||||
Steven Hollabaugh | (918) | @.com | ||||||||
Steven Hollabaugh | (918) | @.com |