Active Projects
CSAH 21 Slope Stabilization
Infrastructure
Results
$3,503,009 CJ est. value
New Ulm, MN 56073
2022 Highway Striping
Infrastructure
Results
$255,000 est. value
Saint Peter, MN
2022 Bituminous Material (Asphalt Emulsion)
Infrastructure
Results
Saint Peter, MN
CSAH 15 - Grading, Concrete Surfacing, Culverts, Singing and Lighting
Kerns Drive - Box Culvert/Bridge and Slope Stabilization
2023 Highway Striping
CSAH 15 Culvert
CSAH 23 Ravine Stabilization
Nicollet County Public Works
Company Type: Owner
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Joel Hawbaker | (507) | @.us | ||||||||
Seth Greenwood | (507) | @.us | ||||||||
Thomas Goblirsch | (507) | @.us |