Active Projects
Panther Gap Road Post Mile 0.50 Tree Clearing
Infrastructure
Results
$18,102 CJ est. value
Garberville, CA 95542
Redway Drive and Redwood Drive Highway Safety Improvement Project
Infrastructure
Results
$275,640 CJ est. value
Redway, CA 95560
Panther Gap Road PM 0.50 Storm Damage Repair Project
Infrastructure
Results
$2,844,580 est. value
CA
ADA Curb Ramp Improvements (Phase 2)
Pavement Rehabilitation 2023
CSP and HDPE Plastic Pipeliner
Pine Hill Road Over Swain Slough Bridge No. 04C-0260
Upper Bidwell Park Road Sediment Reduction Project
Remove Culvert, Place Reinforced Concrete and Corrugated Steel Pipes
Place 36 Trenchless Steel Pipe and Modify Roadway Information System
Pacific Earthscape
1225 Central Ave
CA, McKinleyville 95519
(707) 840-9442
Company Type: Sub-Contractor
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Corina Mullen | (707) | @.com | ||||||||
Corina Mullen | (707) | @.com | ||||||||
Grant Ford | (707) | @.com | ||||||||
Grant Ford | (707) | @.com | ||||||||
Grout Fort | (707) | @.com |