Active Projects
Construction Plan for East Wastewater Treatment Plant Flow Equalization Basin Solids Removal and Liner Replacement
Infrastructure
Post-Bid
$850,000 est. value
McAlester, OK 74501
Breckenridge Forest North Sections 3 and 4 Detention Pond Improvements
Infrastructure
Post-Bid
$1,521,969 est. value
Houston, TX
Toepperwein Road Concrete Fence Project
Alteration
Post-Bid
Live Oak, TX 78148
12th to 15th Street Shoreline Erosion
Prairie Ridge Phase 3 Pond Revisions
Bay Colony Area Detention Modification
Old Justin Road - Mass Grading, Paving, Water, Sanitary, and Drainage Facilities
RFQ Construction Manager at Risk - Library in the Park Project
Fire Station 2
Bella Lane South Extension and Alpha Road Connector
Patriot Environmental
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Daniel Barber | (405) | @.com |