Active Projects
Smart Overlay, ADA Improvements: The Work Consists of Hot-Mix Asphalt Surface Removal, Pavement Patching, Hot-mix Asphalt Surface Overlay, Sidewalk Removal on US 12/IL 59 (Rand Rd)
Infrastructure
Bidding
$400,000 CJ est. value
Fox Lake, IL 60041
Smart Overlay, ADA Improvements, Hot-Mix Asphalt Surface Removal, Pavement Patching, Hot-Mix Asphalt Surface Overlay, Sidewalk Removal and Replacement on US 14 (Division Street)
Infrastructure
Bidding
$500,000 CJ est. value
Woodstock, IL 60098
Smart Resurfacing
Infrastructure
Bidding
$200,000 CJ est. value
Woodstock, IL 60098
Intersection Improvement of US 41
Smart Overlay, ADA Improvements: HMA Removal / Replacement, Pavement Patching, Curb Ramps (ADA) Improvements
HMA Resurfacing With Patching, and Aggregate Shoulders on Diggins Street
Full Depth Pavement Reclamation, Aggregate Subgrade, HMA Pavement, Curb, Gutter and Sidewalk Replacement, and Storm Sewer on Fish Lake Road
Proposed Roadway Improvements for Sunnyside Beach Drive
Dog Exercise Area Site Improvements at Duck Farm Forest Preserve
HMA Resurfacing With Aggregate Shoulders on Winn Road
Payne & Dolan
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Donna Colebaugh | (847) | @.com | ||||||||
Ryan Flores | (847) | @.com | ||||||||
Susan Taylor | (847) | @.com | ||||||||
Tim Swanson | (847) | @.com |