Active Projects
Water Pressure Filtration Rehabilitation
Infrastructure
Bidding
$1,600,000 CJ est. value
South Dennis, MA 02660
1-86 Well Cleaning and Pump Maintenance
Term Contract
Post-Bid
Kingston, MA 02364
1-86 Well Cleaning and Pump Maintenance.
Term Contract
Post-Bid
Kingston, MA 02364
Removal, Inspection, Maintenance and Reinstallation of the Well Pump
Water Main Improvements for Cape View Way 40B
Pump Replacement for Gravel Packed Wells
Construction of a 0.5 Mg Composite Elevated Water Storage Tank
Cleaning Exterior of 1 MG Composite Elevated Water Storage Tank
Elevated Water Tank
Cleaning and Painting 1.3 Mg Steel Water Standpipe
Resilient Civil Engineering
Company Type: Engineer
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Kristen Berger | (508) | @.com | ||||||||
Micheal Cotter | (508) | @.com |