Active Projects
Contract 1, Water Transmission Mains to Mount Olivet Ground Storage Reservoir
Infrastructure
Bidding
$770,000 CJ est. value
Leavenworth, KS 66048
CSO 19 Sewer Separation (Phase 1)
Infrastructure
Bidding
$9,500,000 CJ est. value
Kansas City, KS 66101
2022 Sanitary and Storm Sewer Repair and Replacement -#1
Infrastructure
Post-Bid
$2,300,000 CJ est. value
Kansas City, KS 66101
Remodel and Addition to Shawnee Mission East High School
Rehabilitation of Existing 12-inch Wastewater Force Main Project - 82 nd Street from Approximately Ottawa Street to Shawnee Street
Water Main Replacement MLK Boulevard to W. 80th Terr, State Line Road to Prospect Avenue
Water Main Replacement along Superior to I 435 Gardner Rd to E 9th St
Parrot Farm Road Waterline
Highway 33 Waterline Replacement
Connor Creek Tributary Interceptor Improvements
Rodriguez Mechanical
Company Type: Sub-Contractor
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Beth Symmonds | (913) | @.com | ||||||||
Brad Webb | (913) | @.com | ||||||||
Chris Evinger | (913) | @.com | ||||||||
Dave Rodriguez | (913) | @.com | ||||||||
Dave Scaggs | (913) | @.com | ||||||||
Kyle Dunwoody | (913) | @.com | ||||||||
Luke Richmond | (913) | @.com | ||||||||
Matt Eker | (913) | @.com | ||||||||
Pat Wheeler | (913) | @.com | ||||||||
Paul Rodriguez | (913) | @.com | ||||||||
Paul Rodriguez Jr | (913) | @.com | ||||||||
Ronnie McGarrah | (913) | @.com |