Active Projects
Pike Terrace Subdivision
New Construction, Infrastructure
Design
$41,000,000 CJ est. value
Weslaco, TX 78596
Slurry Displaced Drilled Shaft Wetwell Installation
Infrastructure
Bidding
$70,000 CJ est. value
McAllen, TX 78501
Water Line Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Lyford, TX 78569
Proposed Sanitary Sewer Improverrbents, Existing Septic Systernrs Decommissioning, and Proposed Lift Station far Capisallo Terrace Subdivision
Band Hall Addition
Proposed Storm Water Pump Station, Storm Water Regional Detention Facility and Storm Sewer Force Main Improvements
Sanitary Sewer and Water Improvements - Vitruvian Townhomes
Capisallo Terrace Sanitary Sewer Improvements
Wastewater Treatment Plant Nos. 1 and 2 Centrifuge and Blower Rehabilitation
Rehabilitation and Improvements to the Stormwater Pump Station Collier Park - Phase 2
SWG Engineering, LLC
Company Type: Architect
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Bill Ueckert | (956) | @.com | ||||||||
Cindy Meza | (956) | @.com | ||||||||
Eloy Olivo | (956) | @.com | ||||||||
Jose G. Reyes | (956) | @.com | ||||||||
Jose Reyes | (956) | @.com | ||||||||
Monica Duenes | (956) | @.com | ||||||||
Randall Winston | (956) | @.com |