Active Projects
ATV Trail Improvements - Pfeiffer Lake Forest Road 256 to County Road 361
Infrastructure
Post-Bid
MN
ATV Trail Improvements - US Highway 53 to Trillium Road
Infrastructure
Post-Bid
MN
Milling, Grading, Bituminous Surfacing, Traffic Signals, ADA Improvements, Retaining Wall, Roundabout, and Lighting
Infrastructure
Results
MN
Crack Repair Special, Scrub Seal, Fog Seal, and Pavement Markings
(2022 Crack Sealing) - Crack Sealing and Crack Repair Special
Full Depth Bituminous Reclamation, Bituminous Pavement Reclamation, Aggregate Base, Aggregate Base Class 5, Base Stabilization, Plant Mixed Bituminous Surface, Aggregate Surfacing, and Aggregate Surfacing Class 5
Bituminous Surface, Bituminous Pavement Reclamation, Aggregate Base Stabilization, Plant Mixed Bituminous Surface, Aggregate Base, Aggregate Base Class 5, Base Stabilization, Shoulder Base Aggregate, Bituminous Surfacing, and Aggregate Surfacing
Culvert Replacement, Plant Mixed Bituminous Patches, and Aggregate Base Class 5
Full Depth Reclamation, Aggregate Base Stabilization, Plant Mixed Bituminous Surface, Aggregate Base, Aggregate Surfacing, Culvert Replacement, Milling, and Bituminous Pavement Reclamation
(2022 GRIP) (Low Prime), Consisting of 9 Projects - Bituminous Pavement Reclamation, Aggregate Base Class 5, Aggregate Base Stabilization, and Calcium Chloride
Saint Louis County Highway Maintenance
Company Type: Agency
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Eric Fallstrom | (218) | @.gov |