Active Projects
Widen and Resurface - SH 51
Infrastructure
Post-Bid
$11,438,825 CJ est. value
Tahlequah, OK 74464
Grade, Drain, Bridge and Surface - SH-82
Infrastructure
Post-Bid
$40,951,307 CJ est. value
Tahlequah, OK 74464
Bridge and Approaches - US 69
Infrastructure
Post-Bid
$11,366,039 CJ est. value
Wagoner, OK 74467
Non-Arterial Street Rehabilitation Maintenance Zones
Grade, Drain, Surface, and Bridge - US-270
Bridge and Approaches and Resurface (Asphalt) US-75/SH-16
Citywide Arterial Mill, Patch and Overlay
Pavement and Bridge Rehab, Retaining, Visual and Sound Wall - I-244
Grade, Drain, Surface, and Bridge Turner Turnpike: Over SH-66, 1.8 Miles Southwest of US-177 In Wellston.
Frontage Road, County Road, Retaining Wall, and Bridge 43.4 Replacement
Sherwood Construction Inc.
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Brian Welborn | (918) | @.net | ||||||||
Jeremy Kelly | (918) | @.net | ||||||||
Kyle Conaway | (918) | @.net | ||||||||
Rod Abbott | (918) | @.net |