Active Projects
Pedestrian Bridges Animas River North Trail Extension
Infrastructure
Post-Bid
$4,500,000 CJ est. value
Farmington, NM 87401
On-Call Professional Land Surveying Services
Term Contract, Alteration
Post-Bid
CO
Tohatchi East Flats Individual Wells
Infrastructure
Post-Bid
$1,891,649 est. value
Tohatchi, NM
Landfill Monitoring and Maintenance for the Red Rock Canyon Landfill
Amphitheater Facility Analysis and Design Timeline
R3 And 5 Nps Field Survey And Right Of Way Plans Engineering Services
Water Rights Engineering
Region 2 Non-Project Specific Surveying and Right of Way Engineering Services
Pavement Rehabilitation and Restriping Various Streets
Foothills Drive Enhancement Phase II
Souder Miller and Associates
Company Type: Engineer
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Colin Daly | (505) | @.com | ||||||||
Doug Mize | (505) | @.com | ||||||||
Douglas Mize | (505) | @.com | ||||||||
Greta Quintana | (505) | @.com | ||||||||
Pat Weber | (505) | @.com |