Active Projects
Hot Mix Asphalt Cold Milling and Resurfacing, Storm Sewer, Curb Ramps and Pavement Markings on 40th Street
Infrastructure
Bidding
$585,000 CJ est. value
Kentwood, MI 49512
Reconstruction of Eleanor Street from Plainfield Avenue to Diamond Avenue and Reconstruction of Fremont Avenue from Third Street to Fourth Street
Infrastructure
Bidding
$3,480,187 CJ est. value
Grand Rapids, MI 49503
Sidewalk and ADA Ramp Repair at Various Locations 2024
Infrastructure
Bidding
$610,680 CJ est. value
Grand Rapids, MI 49503
Reconstruction of Hall Street from Madison Avenue to Eastern Avenue and Water Main Abandonment in Adams Street from Paris Avenue to Eastern Avenue and Water Main
Signal Replacement/Interconnect and Concrete Curb, Gutter and Sidewalk on Whitehall Road
Traffic Signal Modernization and Sidewalk Ramp Upgrade on Old US-27
Traffic Signal Modernization and Signing on I-196BS
Installation of Overheight Vehicle Detection and Notification System at the Portage Lake Lift Bridge on US-41/M-26
Blue Star Highway Bridge Navigation Lighting
Traffic Signal Modernizations and Sidewalk Ramp Upgrades on Various Routes