Active Projects
IH0020 - Flexible Base
Infrastructure
Results
$84,000 est. value
TX
IH0020 - Winter Weather Material
Infrastructure
Results
$299,372 est. value
TX
Materials Only: Bulk Hydraulic Cement
Results
Less than $198,000 est. value
TX
Concrete Repair Material (Material Only)
RDC (Materials Only) Drift Control and Anti-Foamer)
Informal - Water Filters and Ice Machine Filters CM - TB