Active Projects
Federal Correctional Institution (FCI) Greenville - Replace Programmable Logic Control (PLC)
Renovation
Design
$5,000,000 CJ est. value
Greenville, IL 62246
Replace Fire Pump at FCI Jesup, GA
Infrastructure
Bidding
$5,000,000 CJ est. value
Jesup, GA 31545
FCI La Tuna- Install Chilled Water
Renovation
Bidding
$10,000,000 CJ est. value
Anthony, TX 79821
Replace Waste Lines at Metropolitan Correctional Center San Diego
FCI Otisville - Install AST
RFQ Design - Upgrade Switchgear at FCC Lompoc
MCC Chicago - FS Drainage and Floor
RFP Contractor - Replace Roofing Phase 1
Replace Water Tank
FCC Oakdale - Roof Replacement And Mold Remediation
US Department of Justice - Field Acquisition Office (FAO)
Company Type: Owner
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Bose George | (972) | @.gov | ||||||||
Chad Schickel | (972) | @.gov | ||||||||
Christy Rios | (972) | @.gov | ||||||||
Corey Zanolini | (972) | @.gov | ||||||||
Donald Osborn | (972) | @.gov | ||||||||
Edward Krug | (972) | @.gov | ||||||||
Jason Morgan | (972) | @.gov | ||||||||
Kimberly Johnson | (972) | @.gov | ||||||||
Kyle Ball | (972) | @.gov | ||||||||
Marleasia Johnson | (972) | @.gov | ||||||||
Matthew Shirley | (972) | @.gov | ||||||||
Patrick Ford | (972) | @.gov | ||||||||
Paul Atkinson | (972) | @.gov | ||||||||
Robert Cox | (972) | @.gov | ||||||||
Robert Gabell | (972) | @.gov | ||||||||
Scott Ballinger | (972) | @.gov | ||||||||
Tammie O Johnson | (972) | @.gov | ||||||||
Trisha Holm | (972) | @.gov |